Cold RoomCompleted

Pharmaceutical Cleanroom — Tangerang

Tangerang, Banten
Cleanroom Panel
1,800 m²
Pharmaceutical Cleanroom — Tangerang
Overall view — Pharmaceutical Cleanroom — Tangerang
Floor Area
1.800
Panel Thickness
100 mm
Duration
8 minggu
Year
2026
01 / Project Summary

About This Project

Cleanroom Farmasi in Tangerang, Banten was carried out using a panel cleanroom system. The installation focused on clean, precise, standard-compliant results, with field coordination that kept operations running smoothly throughout.

The cleanroom panel system was installed on the walls and ceiling with a smooth, non-porous surface that is easy to sanitize. Every joint is flush with a hidden-screw system and radius coving at the wall-to-floor junctions, leaving no gaps for dirt to collect.

02 / Scope of Work

What We Delivered

Cleanroom wall & partition panel installation
Production-area ceiling panel installation
Flush hidden-screw jointing system
Radius coving at wall-to-floor junctions
Inspection door & window installation
Hygienic finishing & final cleanup
03 / Technical Specifications

Installation Technical Details

LocationTangerang, Banten
RegionBanten
CategoryCold Room
Panel TypeCleanroom Panel
Panel Thickness100 mm
Floor Area1,800 m²
Duration8 minggu
ApplicationDinding & ceiling cleanroom area produksi
Year2026
StatusCompleted
Documentation1 photos
04 / Challenge & Solution

Our Approach

Challenge

A cold room demands zero cold-air leakage; even the smallest gap can trigger condensation and ice build-up.

Our Solution

The team installed panels with a tight locking system and ran thorough thermal testing before handover to ensure the room is fully sealed.

05 / Photo Documentation