Cold Room
Pharmaceutical Cleanroom — Tangerang
- Completed
- Tangerang, Banten
- Cleanroom Panel
- 1,800 m²

Overall view — Pharmaceutical Cleanroom — Tangerang
- Floor Area
- 1.800 m²
- Panel Thickness
- 100 mm
- Duration
- 8 minggu
- Year
- 2026
01 / Project Summary
About This Project
Cleanroom Farmasi in Tangerang, Banten was carried out using a panel cleanroom system. The installation focused on clean, precise, standard-compliant results, with field coordination that kept operations running smoothly throughout.
The cleanroom panel system was installed on the walls and ceiling with a smooth, non-porous surface that is easy to sanitize. Every joint is flush with a hidden-screw system and radius coving at the wall-to-floor junctions, leaving no gaps for dirt to collect.
02 / Scope of Work
What We Delivered
- Cleanroom wall & partition panel installation
- Production-area ceiling panel installation
- Flush hidden-screw jointing system
- Radius coving at wall-to-floor junctions
- Inspection door & window installation
- Hygienic finishing & final cleanup
03 / Technical Specifications
Installation Technical Details
- Location
- Tangerang, Banten
- Region
- Banten
- Category
- Cold Room
- Panel Type
- Cleanroom Panel
- Panel Thickness
- 100 mm
- Floor Area
- 1,800 m²
- Duration
- 8 minggu
- Application
- Dinding & ceiling cleanroom area produksi
- Year
- 2026
- Status
- Completed
- Documentation
- 1 photos
04 / Challenge & Solution
Our Approach
Challenge
A cold room demands zero cold-air leakage; even the smallest gap can trigger condensation and ice build-up.
Our Solution
The team installed panels with a tight locking system and ran thorough thermal testing before handover to ensure the room is fully sealed.