Skip to content

Cold Room

Pharmaceutical Cleanroom — Tangerang

  • Completed
  • Tangerang, Banten
  • Cleanroom Panel
  • 1,800 m²
Pharmaceutical Cleanroom — Tangerang

Overall view — Pharmaceutical Cleanroom — Tangerang

Floor Area
1.800
Panel Thickness
100 mm
Duration
8 minggu
Year
2026

01 / Project Summary

About This Project

Cleanroom Farmasi in Tangerang, Banten was carried out using a panel cleanroom system. The installation focused on clean, precise, standard-compliant results, with field coordination that kept operations running smoothly throughout.

The cleanroom panel system was installed on the walls and ceiling with a smooth, non-porous surface that is easy to sanitize. Every joint is flush with a hidden-screw system and radius coving at the wall-to-floor junctions, leaving no gaps for dirt to collect.

02 / Scope of Work

What We Delivered

  • Cleanroom wall & partition panel installation
  • Production-area ceiling panel installation
  • Flush hidden-screw jointing system
  • Radius coving at wall-to-floor junctions
  • Inspection door & window installation
  • Hygienic finishing & final cleanup

03 / Technical Specifications

Installation Technical Details

Location
Tangerang, Banten
Region
Banten
Category
Cold Room
Panel Type
Cleanroom Panel
Panel Thickness
100 mm
Floor Area
1,800 m²
Duration
8 minggu
Application
Dinding & ceiling cleanroom area produksi
Year
2026
Status
Completed
Documentation
1 photos

04 / Challenge & Solution

Our Approach

Challenge

A cold room demands zero cold-air leakage; even the smallest gap can trigger condensation and ice build-up.

Our Solution

The team installed panels with a tight locking system and ran thorough thermal testing before handover to ensure the room is fully sealed.