Skip to content
All Projects
FactoryCompleted

Pabrik Ciki - Bandung

Rancaekek, Kabupaten Bandung
Cleanroom Panel
5000m2
Pabrik Ciki - Bandung
Overall view — Pabrik Ciki - Bandung
Floor Area
50.002
Panel Thickness
100 mm
Duration
12 minggu
Year
2026
01 / Project Summary

About This Project

Pabrik Ciki in Rancaekek, Kabupaten Bandung was carried out using a panel cleanroom system. The installation focused on clean, precise, standard-compliant results, with field coordination that kept operations running smoothly throughout.

The cleanroom panel system was installed on the walls and ceiling with a smooth, non-porous surface that is easy to sanitize. Every joint is flush with a hidden-screw system and radius coving at the wall-to-floor junctions, leaving no gaps for dirt to collect.

02 / Scope of Work

What We Delivered

Cleanroom wall & partition panel installation
Production-area ceiling panel installation
Flush hidden-screw jointing system
Radius coving at wall-to-floor junctions
Inspection door & window installation
Hygienic finishing & final cleanup
03 / Technical Specifications

Installation Technical Details

LocationRancaekek, Kabupaten Bandung
RegionKabupaten Bandung
CategoryFactory
Panel TypeCleanroom Panel
Panel Thickness100 mm
Floor Area5000m2
Duration12 minggu
ApplicationDinding & ceiling cleanroom area produksi
Year2026
StatusCompleted
Documentation1 photos
04 / Challenge & Solution

Our Approach

Challenge

A factory often has to keep running partially during installation, so the work must be split into zones on a tight schedule to avoid disrupting production.

Our Solution

Our team scheduled phased installation outside peak production hours and used pre-fabricated panels to minimize on-site installation time.

05 / Photo Documentation