Logistics Warehouse — Surabaya

About This Project
Gudang Logistik in Surabaya, Jawa Timur was carried out using a panel dinding hidden screw system. The installation focused on clean, precise, standard-compliant results, with field coordination that kept operations running smoothly throughout.
Hidden-screw wall panels were installed across the building envelope for a clean facade with no exposed bolts. The insulation layer keeps the interior temperature stable while reducing cooling load for better energy efficiency.
What We Delivered
Installation Technical Details
Our Approach
The long warehouse wall spans demand precise flatness and alignment so the facade stays seamless from end to end.
We used panels with tight production tolerances and a rail mounting system so every panel row stays perfectly aligned along the building.




